Simulation and analysis of water quality in Dongjiang River based on the different scenarios of flood discharge from Shima River and the regulation of Dongjiang Hydro-Project
JIANG Tao, ZHONG Ming, ZOU Longjian, et al. Simulation and analysis of water quality in Dongjiang River based on the different scenarios of flood discharge from Shima River and the regulation of Dongjiang Hydro-Project[J]. Acta Scientiarum Naturalium Universitatis SunYatseni, 2016,55(2):117-124.
JIANG Tao, ZHONG Ming, ZOU Longjian, et al. Simulation and analysis of water quality in Dongjiang River based on the different scenarios of flood discharge from Shima River and the regulation of Dongjiang Hydro-Project[J]. Acta Scientiarum Naturalium Universitatis SunYatseni, 2016,55(2):117-124. DOI: 10.13471/j.cnki.acta.snus.2016.02.021.
a two-dimensional water dynamic and water quality model based on MIKE21 was developed to simulate the water quality at the intake of Dongshen water supply project. The study was carried out in the tidal reach between the Dongjiang HydroProject and Shilong in the downstream of the Dongjiang River
and NH-3-N was taken as the water quality indicator. Different scenarios of flood discharge from the Shima River and the release discharge of the Dongjiang Hydro-Project were used to drive the model for the simulation of the water quality at the intake of the Dongshen water supply project. The results indicate that: ① the change of the NH-3-N concentration at the intake is related to the tidal change
the NH-3-N concentration over-standard occurs during higher high water level period; ② flood tide is the main factor which impacts the water quality at the intake
and the NH-3-N concentration is more than 0.5mg/L during higher high water lever period; ③ more flood discharge from Shima River has the greater effect on the water quality
and the water regulation of the Dongjiang Hydro-Project can cause a significant improvement on water quality in the downstream. The results of this study contribute to the decision-making for the joint operation of the flood discharge from Shima River and the intake of Dongshen water supply project
also have great significance for the emergency operation of the Dongjiang Hydro-Project.
关键词
水库调度泄洪MIKE21模型石马河东江
Keywords
reservoir regulationflood dischargeMIKE21 modelShima RiverDongjiang River