您当前的位置:
首页 >
文章列表页 >
The geological risk assessment model based on extension method in subway construction and operation period
更新时间:2023-12-11
    • The geological risk assessment model based on extension method in subway construction and operation period

    • Acta Scientiarum Naturalium Universitatis SunYatseni   Vol. 58, Issue 5, Pages: 49-58(2019)
    • DOI:10.13471/j.cnki.acta.snus.2019.05.008    

      CLC:
    • Published:2019

      Published Online:25 September 2019

    扫 描 看 全 文

  • CHEN Qing, GAO Yan, ZHU Yuxun, et al. The geological risk assessment model based on extension method in subway construction and operation period. [J]. Acta Scientiarum Naturalium Universitatis SunYatseni 58(5):49-58(2019) DOI: 10.13471/j.cnki.acta.snus.2019.05.008.

  •  
  •  

0

Views

136

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

No data

Related Institution

No data
0