Risk Probability Study on the Combination of Flood and Tide for Tideaffected River
返回论文页
|更新时间:2023-12-11
|
Risk Probability Study on the Combination of Flood and Tide for Tideaffected River
Acta Scientiarum Naturalium Universitatis SunYatseniVol. 49, Issue 2, Pages: 113-118(2010)
作者机构:
1. 华南理工大学水利水电工程系,广东,广州,510640
2.
3. 中山大学水资源与环境系,广东,广州,510600
4.
5. 广东省水利厅,广东,广州,510635
作者简介:
基金信息:
DOI:
CLC:
Published:2010,
Published Online:25 March 2010,
扫 描 看 全 文
LIU Zengmei, , CHEN Zhishen. Risk Probability Study on the Combination of Flood and Tide for Tideaffected River. [J]. Acta Scientiarum Naturalium Universitatis SunYatseni 49(2):113-118(2010)
DOI:
LIU Zengmei, , CHEN Zhishen. Risk Probability Study on the Combination of Flood and Tide for Tideaffected River. [J]. Acta Scientiarum Naturalium Universitatis SunYatseni 49(2):113-118(2010)DOI:
Risk Probability Study on the Combination of Flood and Tide for Tideaffected River
The analysis of floods meeting with tides and the rational selection of the combination of floods and tides are vitally important in planning design for the tide affected rivers. The model for the risk probability of the combination of floods and tides was established in this paper. Firstly
the different copula functions were used to build the bivariate joint distribution of annual maximum flood discharge and its corresponding tidal level and the annual maximum tide level and its corresponding flood discharge
respectively. Then
based on both mentioned above the risk probability analysis models for the combination of floods and tides were put forward. The case study of the combined risk probability of floods and tides for the estuary of the Moyang River was conducted. The results indicated: (1) The combinatorial risk probability of the design flood discharge with the fiftyyear return period and the average value of annual maximum tide level was 6。89%; (2) The combinatorial risk probability of the design tide level with the fifty-year return period and the average value of annual maximum flood discharge was 4。77%. The models for combined probability of the floods and the tides can be used to measure the risk probability of the combination of floods and tides
which can provide scientific basis for the rational selections for the combined probability of floods and tides.
关键词
洪潮遭遇洪潮组合组合风险率Copula函数联合分布
Keywords
floods meeting with tidesthe combination of floods and tidesrisk probability of the combinationcopula functionsjoint distributions
Flood Joint Probability Distribution of theXijiang River and Beijiang River in Guangdong Province
Copula Function-Based Flood Coincidence Probability Analysis for Mainstream and Tributary of the Hanjiang River Basin
Copula-based flood frequency analysis with consideration of synchronous occurrence of wet/dry events in the East River basin
Related Author
CHEN Zhishen
GUAN Shuai
LIN Yingyan
ZHA Xini
DING Bo
TAO Nan
LIU Zufa
ZHANG Zhenghao
Related Institution
Department of Water Resource and Environment,Sun Yatsen University
Center for Water Resources and Environment, Sun Yat-sen University//Key Laboratory of Water Cycle and Water Security in Southern China of Guangdong Higher Education Institutes
Rural Hydropower Bureau of Guangdong Water Resources Bureau
.Department of Water Resources and Environment ∥Key Laboratory of Water Cycle and Water Security in Southern China of Guangdong High Education Institute∥School of Geography and Planning, Guangdong Key Laboratory for Urbanization and Geo-Simulation, Sun Yat-sen University