您当前的位置:
首页 >
文章列表页 >
Optimization of Transfer Waiting Time of Guangzhou Waterbus
更新时间:2023-12-11
    • Optimization of Transfer Waiting Time of Guangzhou Waterbus

    • Acta Scientiarum Naturalium Universitatis SunYatseni   Vol. 54, Issue 3, Pages: 19-25(2015)
    • Published:2015

      Published Online:25 June 2015

    扫 描 看 全 文

  • LI Jun, HUANG Sha. Optimization of Transfer Waiting Time of Guangzhou Waterbus. [J]. Acta Scientiarum Naturalium Universitatis SunYatseni 54(3):19-25(2015) DOI:

  •  
  •  

0

Views

361

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Location routing problem with outsourcing strategy
Optimization of Bridges- Parameters Based on BP Neural Network and Genetic Algorithm
Solving Nonlinear Equations Based on Improved Genetic Algorithm
Prediction Model based on Particle Swarm-projection Pursuit and Genetic-neural Networks
Optimal Two-stage Fuzzy Control for Urban Traffic Signals at #br# Isolated Intersection and Its Simulation

Related Author

ZHU Zixuan
WU Weitiao
LI Ting
JIN Wenzhou
HUANG Xiaoqing
HE Qinghui
TANG Liqun
XI Huifeng

Related Institution

School of Civil and Transportation Engineering, South China University of Technology
School of Construction Engineering Maoming University
School of Building and Communication South China University of Techenology
广州大学工程力学系
0